You are here: Home / SFIA 6 / Skills / Development and implementation / Installation and integration

Installation and integration

Installation and integration subcategory

Systems integration SINT

The incremental and logical integration and testing of components and/or subsystems and their interfaces in order to create operational services.

Porting/software configuration PORT

The configuration of software products into new or existing software environments/platforms.

Hardware design HWDE

The specification and design of computing and communications equipment (such as semiconductor processors, HPC architectures and DSP and graphics processor chips), typically for integration into, or connection to an IT infrastructure or network. The identification of concepts and their translation into implementable design. The selection and integration, or design and prototyping of components. The adherence to industry standards including compatibility, security and sustainability.

Systems installation/decommissioning HSIN

The installation, testing, implementation or decommissioning and removal of cabling, wiring, equipment, hardware and associated software, following plans and instructions and in accordance with agreed standards. The testing of hardware and software components, resolution of malfunctions, and recording of results. The reporting of details of hardware and software installed so that configuration management records can be updated.